Network rail required a substation in a remote location to provide an electric supply.
AIG were contacted to provide a steel substation to protect the equipment in a remote industrial location
AIG fabricated the unit in the factory, the unit was delivered on time to the intended location as required by the client
AIG provided a steel enclosure to site, undertaking abnormal load planning for its vehicle to deliver the substation to site at the required time.